Factory Production Schedule Form
This form calculates the time needed to complete production:
 
Specs:

Name of Items:

i.e. products, widgets, locations, etc.

 
Number of Items to Produce:
Employees Available To Work: 
Average Width and Height
 Avg. Width (inches) Each:  inches
 Avg. Height (inches) Each:  inches
OR
Average Area
 Avg. Area (inches) Each:  squaresq. inchesin.
   
Welding Needed:
Days of Travel:
One-way Miles Daily:
 
Results Needed: Days Required to Perform Listed Work